Manorwood Water Main Replacement, Phase 1

CIP Project Number: 19-014

Project Manager: Ted Hill

Project Description:

The first phase of the Manorwood Water Main Replacement project includes the following PVC water main replacements: 

  • 1,300 linear feet of 6-inch PVC to be replaced with 12-inch ductile iron water main along Manorwood Drive SE from Shaw Road to 26th St SE.
  • 640 linear feet of 6-inch PVC to be replaced with 8-inch ductile iron water main along 34th Ave SE from the 2300 block to Manorwood Drive SE.
  • 260 linear feet of 6-inch PVC to be replaced with 8-inch ductile iron water main along 24th St SE from 35th Ave SE to 34th Ave SE.
  • 190 linear feet of 4-inch PVC to be replaced with 4-inch ductile iron water main along 26th Pl SE from Manorwood Drive SE to Cul-de-sac termination.
  • 190 linear feet of 4-inch PVC to be replaced with 4-inch ductile iron water main along 27th Pl SE from Manorwood Drive SE to Cul-de-sac termination. 

The project will increase available fire flow by increasing water main size at various locations and increase the water mains service reliability from the use of ductile iron pipe.

Approved Budget/Est Cost: $1,018,182

Estimated Schedule:

Design August 2019 to March 2020; 

Construction May 2020 to August 2020

  1. Charles (Ted) Hill, P.E.

    Senior CIP Project Engineer

  2. CJ Corpuz

    CIP Project Inspector

Manorwood Water Main Replacement, Phase 1